Never Written a Bid Before? A Beginner's Guide to your first Tender

Take comfort in the fact that very business that bids for public sector work today started with the same experience: opening a tender document for the first time and feeling completely out of their depth. A hundred pages of tender instructions, evaluation criteria, compliance requirements, and a set of technical questions that all need answering, with no obvious place to begin and a genuinely high-stakes deadline attached to it.

‍We see this all the time at Wordsmith Projects. Businesses across the Midlands and further afield come to us with real technical ability and a strong track record of delivery but the moment a formal tender lands on their desk, that capability becomes very hard to put into words on the page and businesses either decide to give it a miss or bury their head in the sand in the hope it will be easier the next time they look at it.

‍The Mistake almost every First-Time Bidder makes

Faced with an unfamiliar document and a looming deadline, the natural instinct is to open it and start answering the technical questions straight away, usually in whatever order they appear, with different team members grabbing different sections to save time. It feels productive. It almost never is.

Attempting to write the bid before you've fully understood what's being asked leads to answers that can miss what the evaluator is actually scoring. Sections end up inconsistent with each other. And because nobody stepped back to plan the workload, the final days before submission turn into exactly the kind of last-minute scramble that causes basic compliance mistakes; a missing appendix, an unanswered sub-question, a page limit ignored.

The alternative is to resist writing anything until you've done three things first.

Step One: Understand the Bid before you write

Read the tender document properly before drafting a single answer. Strip out the procurement jargon and identify, question by question, exactly what's being scored and against what weighting. Check the compliance requirements in the pre-qulaification questionnaire (PQQ) first - insurances, accreditations, capability - separately from the written questions, since missing one of these can disqualify an otherwise strong bid regardless of how well it's written.

Then work out what the buyer problem is, what are looking to achieve from taking a business on to deliver for them. Is quality, price or innovation important to them? Build your delivery solution around this and develop key win themes around these problems.

At the same time, start gathering the evidence you'll need to prove you capability: past contract data, case studies, and results specific enough to answer the question being asked rather than a generic version of your capability.

Step Two: Turn the Bid into a Managed Project

A tender response is a project with a hard deadline, and it should be planned like one. Break it into four stages:

  1. Brief (understand what's being asked)

  2. Scope (decide who's answering what)

  3. Plan (set internal deadlines working backwards from submission)

  4. Control (track progress and review before it goes out)

Assigning clear ownership early is what prevents the chaos of everyone touching everything in the final 48 hours. When each person knows exactly which questions are theirs and by when a first draft is due, the whole process becomes calmer and leaves real time for review, rather than a rushed proofread five minutes before the portal closes.

Step Three: Start Building a Reusable Framework

Your first bid will take longer than it should, and that's normal. What matters is treating it as the foundation of a system rather than a one-off task. Keep every piece of evidence you gather: case studies, data, references in a central bank you can draw on for the next opportunity. Note down any feedback you receive, whether you win or lose, and use the feedback to improve your next submission.

Over time, it gets easier and this turns bid writing from a stressful unknown into a repeatable process: the same structure, a growing evidence bank, and a team that knows its role from day one.

‍From First Bid to Repeatable Win

Your first tender doesn't have to be a leap into the unknown. With the brief properly understood, the work planned as a project, and the beginnings of a reusable framework in place, it becomes a manageable process you can build on every time a new opportunity lands.

‍ At Wordsmith Projects, we've spent over a decade helping first-time and experienced bidders alike build exactly this kind of system. Book your free 30-minute discovery call and let's get your next submission off to the right start.

Previous
Previous

Why did you lose that Tender? The real reasons Bids fail (and how to fix them)

Next
Next

Social Value in Facilities Management Bids: How to Score Higher Without Overpromising