PQQ, SQ or PSQ? What Supplier Questionnaires are called now, and what to do when one lands

In the PQQ vs SQ video, I argue with myself about which questionnaire is which. The short answer is that they do the same job under different names. The longer answer is in this blog. We cover where each name came from, the newer one you'll now see in public sector tenders, who still sends PQQs, and what you need to do to get your business ready before one arrives.

What a PQQ is, in one sentence

A Pre-Qualification Questionnaire (PQQ) is a buyer's way of checking that your business is eligible, stable and capable before inviting you to tender. In business terms, it's the stage 1 gate you pass through before you're allowed to compete on quality and price.

The PQQ, SQ, PSQ acronyms, sorted

  • PQQ (Pre-Qualification Questionnaire): used in the public and private sector and in main contractors' supply chains.

  • SQ (Standard Selection Questionnaire): used in public sector tenders run under the Public Contracts Regulations 2015.

  • PSQ (Procurement Specific Questionnaire): used in public sector tenders run under the Procurement Act 2023.

  • CDP (Central Digital Platform): where suppliers now register their core business information for all public sector tenders.

  • Conditions of participation: the Act's new name for selection criteria, set out in the tender notice and documents.

  • ITT (Invitation to Tender): the main tender stage, after any selection stage.

What changed under the Procurement Act 2023

The video's line that "terminology and processes may change" has already come true. The Procurement Act 2023 went live on 24 February 2025. Under it, above-threshold public procurements no longer collect supplier information through the Standard Selection Questionnaire. Suppliers register their basic information on the Central Digital Platform instead, and buyers ask any extra questions through a Procurement Specific Questionnaire, which does a similar job to the old PQQ/SQ.

What does this mean in practice for businesses who want to bid for public sector contracts:

  • Register on the Central Digital Platform and keep your core information up to date. You'll be asked to share it for each procurement.

  • Expect a PSQ alongside it covering exclusions, plus the conditions of participation for that contract.

  • Contracts that started before February 2025 can still be running under the old rules, so you may still see PQQs or SQs for a while.

PQQ Pass/fail, or scored?

Selection questionnaires have traditionally been pass/fail. You either meet the minimum standard or you don't. That's changing. Buyers are increasingly scoring some sections, with technical capability the most common, and sometimes using those scores to decide who goes through to full tender stage.

So don't treat a PQQ or PSQ as a tick-box exercise. Check the tender documents for how each section will be assessed. Where a section is scored, give it the same care as a quality answer at ITT stage, with relevant contract examples, measurable outcomes and evidence that matches the contract you're bidding for.

Who still sends PQQs

The name hasn't gone away. In construction especially, main contractors still send PQQs to subcontractors before adding them to a supply chain or approved list. These are often built around industry standards and accreditations. Private sector clients, housing associations and some below-threshold public buyers use PQQs too. If you're a specialist trade or an SME supplying tier-one contractors, a PQQ in construction is often the first document you'll see.

What every questionnaire asks, whatever it's called

The names change, but the topics stay much the same. Have these ready:

  • Company details, ownership and any connected persons

  • Exclusion declarations, such as convictions, insolvency and past contract performance

  • Financial standing, usually two or three years of accounts

  • Insurance certificates (employer's liability, public liability, professional indemnity)

  • Policies: health and safety, quality, environmental, equality, modern slavery, data protection

  • Accreditations (ISO 9001, 14001, 45001, CHAS, SafeContractor, Constructionline)

  • Two or three contract examples with client references

  • Carbon Reduction Plan, if the buyer asks for one

Most of the effort comes before you answer the questions. You have to gather all these documents, check they're in date, and make sure your contract examples match what this buyer wants. These usually have to be similar contract value and delivered within the last three years. Head to our Resources Tab and you’ll find a FREE PQQ Cheat Sheet which will help you gather and store all this information.

Don't just copy last year's PQQ answers

This is the advice from the video I'd underline twice. Reusing a previous questionnaire saves time. But you risk carrying over out-of-date policies, expired insurance and examples that don't fit the new contract. Read the buyer's current documents first, then adapt and check all your attachments are still in date. As the Zems Academy case study shows, on our case study tab, getting through the selection stage is the first stage to opening the door to new work.

Need help with a PQQ, SQ or PSQ?

Whether you're a Midlands contractor facing your first supply chain PQQ or an SME responding to a council PSQ, I can help you get it right first time. Find out more about our PQQ support or get in touch through our Whatsapp link below.