Sometimes a lost tender can feel like a mystery: how did a bid that looked so promising lose marks? This is why I put my detective hat on for this video. Lost marks rarely come down to one big mistake. The usual culprits are small and familiar. They hide in plain sight, and you can spot them once you know where to look. So I lined up the three main suspects: the claim with no alibi, the answer that wandered away from the question, and the delivery plan that can't say who was doing what, or when.
This post takes the case on from where the video stops. It covers when to call in a reviewer, what evidence to hand over, the five mistakes I see most often, and a checklist so you can do your own detective work before you submit your winning bid.
Why a bid can read well and still score badly
Evaluators don't award marks for good writing. They score each answer against published criteria, usually on a scale such as 0 to 5, and they often have dozens of submissions to get through. They are looking for very specific things: evidence that proves your capability and matches the requirement, responses that answer every part of the question, and enough detail to believe and have confidence that you can deliver what they need.
The person who wrote the bid is always the worst-placed person to judge it. They’ve been too close to it and might miss something important. You already know what you meant, so you read the gaps as filled. A reviewer reads it the way the evaluator will, cold, against the criteria and with nothing assumed.
When to book a Bid Review
Timing decides how much a review can fix. If it’s too early, then there's nothing to review. If it’s too late then you have no time to make major changes.
The best point: a full first draft, with enough time left to rewrite at least one weak answer properly. Plan around the submission deadline, not the date the draft happens to be finished.
Before you start: for a must-win contract, a short review of your answer plan saves more time than anything else. It catches a misread question before you've written 1,500 words on it.
After a loss: reviewing a bid that failed, alongside the buyer's feedback, is one of the quickest and best ways to improve the next one.
What to send your reviewer
A reviewer can only check your answers against what the buyer asked for if they have the buyer's documents. Send:
The full tender pack: the specification, evaluation criteria and weightings, submission instructions and any clarifications issued
Your draft answers, in the format they will be submitted
Any word or page limits, or any submission portal's restrictions
Feedback from previous bids to the same buyer or framework, if you have it
Five bid writing mistakes a review catches
The video covers the first three. These are the five I see most often across construction, FM, energy and training tenders:
Claims without proof. "Experienced", "reliable" and "exceptional" mean nothing to an evaluator unless a number, a client or an outcome backs them up.
Answering the question you wish you'd been asked. Company history in reply to a mobilisation question. Generic quality policy in reply to a question about contract-specific KPIs.
Delivery plans with no names, dates or measures. If the evaluator can't tell who does what and when, they won’t be confident in your delivery. Personalise your bid.
Inconsistencies across the bid. Different staff numbers in the method statement and the pricing schedule. A mobilisation period that doesn't match the timeline. Evaluators notice, and it undermines trust in everything else.
Compliance slips. A missed mandatory document, a breached word limit or an unsigned declaration. These can disqualify a bid and the rest of the quality response will not even scored.
Red-flag words to search for before you submit
Run a quick search of your draft for these words. Each one usually marks a claim that needs evidence or detail behind it:
robust, seamless, dedicated, bespoke, world-class
timely, promptly, as soon as possible
the team, our staff, appropriate personnel
we always, we never, 100% (unless you can prove it)
You don't have to delete them all. Each one should be followed by something specific, such as a name, a timescale, a measure or an example.
A self-review bid checklist
Run this on every answer before your bid goes to anyone else:
Have I answered every part of the question, in the order it was asked?
Could an evaluator find each scoring point in under a minute?
Is every claim backed by a case study, a figure or a named client?
Does the delivery plan say who, what, when and how it's measured?
Do the figures match across all answers and the pricing?
Is it within the word or page limit, in the required format?
Have I followed every submission instruction?
If you're ticking every box with confidence, you're in good shape. If you hesitated on two or more, a fresh pair of eyes will pay for itself.
What you get back from a Wordsmith bid review
A spell check is a small part of it. You get a critical, question-by-question look at how well your bid responds to what the buyer needs. That means clear recommendations on what to strengthen and why, and a view on where marks are likely being lost. I've reviewed and written bids for 15 years, and that experience lets me read a submission the way an evaluator will.
A review can't guarantee you a winning bid. It means you find the weak spots before the evaluator does, while there's still time to fix them.
From Derby and Nottingham to Birmingham and Leicester, and nationally, if you have a bid coming up and want it reviewed before you submit, find out about our bid review services or book a call. Let’s talk.
Related blogs: What do winning bids have in common? · Why you lost that tender